LIFE-CYCLE O&S COST COMPARISON:
PRIOR POE AND CURRENT POE
ALTERNATIVE:_______________ a
DATE:
WEAPON SYSTEM:
CONSTANT FY___$ (000)
PRIOR POE CURRENT POE NOTE
(AS OF:___) b (AS OF:___) DELTA REF. # c
1.0 MISSION PERSONNEL
1.1 OPERATIONS
1.2 MAINTENANCE
1.3 OTHER MISSION PERSONNEL
2.0 UNIT-LEVEL CONSUMPTION
2.1 POL/ENERGY CONSUMPTION
2.2 CONSUMABLE MATERIAL/REPAIR PARTS
2.3 DEPOT-LEVEL REPARABLES
2.4 TRAINING MUNITIONS/EXPENDABLE STORES
2.5 OTHER
3.0 INTERMEDIATE MAINTENANCE (EXTERNAL TO UNIT)
3.1 MAINTENANCE
3.2 CONSUMABLE MATERIAL/REPAIR PARTS
3.3 OTHER
4.0 DEPOT MAINTENANCE
4.1 OVERHAUL/REWORK
4.2 OTHER
5.0 CONTRACTOR SUPPORT
5.1 INTERIM CONTRACTOR SUPPORT
5.2 CONTRACTOR LOGISTICS SUPPORT
5.3 OTHER
6.0 SUSTAINING SUPPORT
6.1 SUPPORT EQUIPMENT REPLACEMENT
6.2 MODIFICATION KIT PROCUREMENT/INSTALLATION
6.3 OTHER RECURRING INVESTMENT
6.4 SUSTAINING ENGINEERING SUPPORT
6.5 SOFTWARE MAINTENANCE SUPPORT
6.6 SIMULATOR OPERATIONS
6.7 OTHER
7.0 INDIRECT SUPPORT
7.1 PERSONNEL SUPPORT
7.2 INSTALLATION SUPPORT
GRAND TOTAL
SYSTEM COST DRIVERS d
PROCUREMENT QUANTITY
OPERATIONAL QUANTITY
OPTEMPO
FUEL CONSUMPTION
MILPERS AUTHORIZATIONS
NOTE: REFLECTS GENERIC COST ELEMENT STRUCTURE. SUBSTITUTE CES APPROPRIATE FOR SYSTEM BEING ESTIMATED.
a. IDENTIFY TITLE OF PROPOSED ALTERNATIVE (OR OF OTHER ALTERNATIVES, WHERE APPLICABLE). A SEPARATE FORMAT MUST BE COMPLETED FOR EACH ALTERNATIVE.
b. AT MILESTONE I, PRIOR POE AND CURRENT POE WILL NORMALLY MATCH. FOR SUBSEQUENT PERIODS, PRIOR POE WILL REFLECT THE POE COMPLETED AND APPROVED FOR THE PRIOR MILESTONE.
c. IDENTIFY REFERENCE NUMBER IN "NOTE REF. #" COLUMN AND SEPARATELY EXPLAIN COST DIFFERENCES.
d. IDENTIFY THE PARAMETERS FOR SIGNIFICANT COST DRIVERS WHICH
MAY HAVE CHANGED SINCE THE LAST ESTIMATE. TAILOR THE LIST AS APPROPRIATE.