TIME-PHASED LIFE-CYCLE
O&S COSTS
ALTERNATIVE:_______________ a
DATE:
WEAPON SYSTEM:
CONSTANT FY___$ (000)
DEPLOYMENT CUMULATIVE PHASE-OUT TOTAL ANNUALIZED
FY___ PERIOD STEADY-STATE PERIOD LIFE CYCLE STEADY-STATE
& PRIOR FY___ FY___b FY___TO FY___ FY___ FY___b O&S RECURRING
SYSTEMS DEPLOYED (CUM)/YR
OPTEMPO HRS/SYSTEM/YR c
1.0 MISSION PERSONNEL
1.1 OPERATIONS
1.2 MAINTENANCE
1.3 OTHER MISSION PERSONNEL
2.0 UNIT-LEVEL CONSUMPTION
2.1 POL/ENERGY CONSUMPTION
2.2 CONSUMABLE MATERIAL/REPAIR PARTS
2.3 DEPOT-LEVEL REPARABLES
2.4 TRAINING MUNITIONS/EXPENDABLE STORES
2.5 OTHER
3.0 INTERMEDIATE MAINTENANCE (EXTERNAL TO UNIT)
3.1 MAINTENANCE
3.2 CONSUMABLE MATERIAL/REPAIR PARTS
3.3 OTHER
4.0 DEPOT MAINTENANCE
4.1 OVERHAUL/REWORK
4.2 OTHER
5.0 CONTRACTOR SUPPORT
5.1 INTERIM CONTRACTOR SUPPORT
5.2 CONTRACTOR LOGISTICS SUPPORT
5.3 OTHER
6.0 SUSTAINING SUPPORT
6.1 SUPPORT EQUIPMENT REPLACEMENT
6.2 MODIFICATION KIT PROCUREMENT/INSTALLATION
6.3 OTHER RECURRING INVESTMENT
6.4 SUSTAINING ENGINEERING SUPPORT
6.5 SOFTWARE MAINTENANCE SUPPORT
6.6 SIMULATOR OPERATIONS
6.7 OTHER
7.0 INDIRECT SUPPORT
7.1 PERSONNEL SUPPORT
7.2 INSTALLATION SUPPORT
GRAND TOTAL
NOTES: REFLECTS GENERIC COST ELEMENT STRUCTURE. SUBSTITUTE CES APPROPRIATE FOR SYSTEM BEING ESTIMATED.
DETAILED DOCUMENTATION (BY CES NUMBER AND YEAR) SHOULD SUPPORT THE DERIVATION OF THESE ESTIMATES.
a. IDENTIFY TITLE OF PROPOSED ALTERNATIVE (OR OF OTHER ALTERNATIVES, WHERE APPLICABLE). A SEPARATE FORMAT MUST BE COMPLETED FOR EACH ALTERNATIVE.
b. INSERT ADDITIONAL FY COLUMNS FOR DEPLOYMENT AND PHASE-OUT PERIODS AS REQUIRED.
c. OPTEMPO MAY BE EXPRESSED IN TERMS OF OPERATING HOURS, FLYING
HOURS, MILES DRIVEN, ETC.