Accession Number : ADA634543


Title :   Final Environmental Assessment: For the Eglin Dormitory Master Plan


Corporate Author : SCIENCE APPLICATIONS INTERNATIONAL CORP SHALIMAR FL


Personal Author(s) : Baker-Littman, Sherri ; Penrose, Bob ; McLaurine, Henry ; Sands, Amy ; Robau, Dave


Full Text : http://www.dtic.mil/get-tr-doc/pdf?AD=ADA634543


Report Date : Mar 2006


Pagination or Media Count : 103


Abstract : The Proposed Action is for the Air Force proponent (796 Civil Engineering Squadron/Civil Engineering Planning Office [796 CES/CEOP]) to implement a Dormitory Master Plan (DMP) that allows for expansion of dormitory facilities and infrastructure through the demolition and construction of new dormitory facilities at Eglin Air Force Base (AFB) (Figure 1-1). The DMP would outline the requirements for the demolition of older dormitory structures and the construction of new buildings and infrastructure at existing sites located on Eglin AFB Main Base (Figure 1-2). Under the Proposed Action, the DMP would involve the demolition of three existing dormitories and construction of six new dormitory buildings which would provide billeting for approximately 288 occupants. The DMP would also involve improvement of associated roads and construction of parking areas. This would be the first of three phases planned over the next 16 years. Chapter 2 provides more detailed information for the proposed project activities.


Descriptors :   *AIR FORCE FACILITIES , *CONSTRUCTION , *ENVIRONMENTAL ASSESSMENT , *HOUSING PROJECTS , AIR QUALITY , EROSION , GEOLOGY , HAZARDOUS MATERIALS , HAZARDOUS WASTES , INFRASTRUCTURE , NOISE , SOILS , WATER QUALITY


Subject Categories : Structural Engineering and Building Technology
      Logistics, Military Facilities and Supplies
      Environmental Health and Safety


Distribution Statement : APPROVED FOR PUBLIC RELEASE