Accession Number : ADA167247


Title :   Public Works Center Pearl Harbor Fleet Moorings Underwater Inspection Report.


Descriptive Note : Rept. for 3-13 May 83.


Corporate Author : NAVAL FACILITIES ENGINEERING COMMAND WASHINGTON DC CHESAPEAKE DIV


Full Text : http://www.dtic.mil/get-tr-doc/pdf?AD=ADA167247


Report Date : Sep 1983


Pagination or Media Count : 208


Abstract : During the period 3 through 13 May 1983, a CHESNAVFACENGCOM Engineer-in-Charge and divers from Underwater Construction Team Two (UCT TWO) conducted an inspection of the 42 fleet moorings operated and maintained by PWC Pearl Harbor. Eighteen of the moorings were found to be in good condition, three should not be used due to major discrepancies, and twenty-one were found to be in satisfactory condition for continued use within the constraints of their load capacities. Keywords: Mooring inspection, Underwater inspection, Fleet moorings.


Descriptors :   *MOORING BUOYS , CAPACITY(QUANTITY) , LOADS(FORCES) , TEAMS(PERSONNEL) , INSPECTION , NAVAL SHORE FACILITIES , DIVERS , UNDERWATER , MOORING , PEARL HARBOR


Subject Categories : Civil Engineering


Distribution Statement : APPROVED FOR PUBLIC RELEASE